Uncategorized

Construction at Library Main Entrance

Visitors to Preston Library will notice that the main front door is not accessible due to demolition and construction of the patio, steps and sidewalk.

During the construction, the library is accessible through Nichols Engineering Building, the front door of which is to the left of Preston Library.  Signs are posted directing library users downstairs to the 4th floor of Nichols. At the end of the hallway, there’s a door that enters to the library’s 4th floor.

The circulation desk and many library staff are up one level, on the 5th floor.

If you need assistance or have any questions, please call 540-464-7129.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s